Inangahua Hydro Tower

Post Covid19 lockdown, Frank was contracted to rebuild the boardwalk and ramp to the Inangahua River Hydro monitoring station.

Along with Simon, the old structure was demolished and then the rebuild of the new structure commenced. Some of which had been constructed off-site due to weather (rain & snow!) and remoteness constraints. Despite the wet conditions and location on the very edge of the river, Frank and Simon were able to get this one knocked off successfully within 4 days. Great job!

Next
Next

Wainui Falls Track Bridge Replacement